|
關(guān)注:1
2013-05-23 12:21
求翻譯:在交越點予埋塑料管防護后立即回填,確保既有光纜安全。是什么意思?![]() ![]() 在交越點予埋塑料管防護后立即回填,確保既有光纜安全。
問題補充: |
|
2013-05-23 12:21:38
Backfill immediately after the crossover point I buried plastic pipe protection, to ensure the safety of both fiber optic cable.
|
|
2013-05-23 12:23:18
At the time to be the point guard buried plastic pipe backfill immediately after, to ensure that both fiber optic cable.
|
|
2013-05-23 12:24:58
Gives buries the plastic tube protection after the junction more spot immediately the backfill, guarantees already has the optical cable security.
|
|
2013-05-23 12:26:38
Immediately after the crossover point to protection of buried plastic pipe backfill, ensure the safety of existing fiber-optic cable.
|
|
2013-05-23 12:28:18
,
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)