|
關(guān)注:1
2013-05-23 12:21
求翻譯:檢查時(shí)間:裝飾工程完成。幕墻工程完工。家具,二級(jí)標(biāo)識(shí)到場(chǎng)。是什么意思?![]() ![]() 檢查時(shí)間:裝飾工程完成。幕墻工程完工。家具,二級(jí)標(biāo)識(shí)到場(chǎng)。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Inspection time: decorative works are completed. The curtain wall project completed. Furniture, two identifies the scene.
|
|
2013-05-23 12:23:18
Check the time, and decoration. Curtain wall construction is completed. Furniture, farm level 2 identity.
|
|
2013-05-23 12:24:58
Inspection time: The decoration project completes.The curtain wall project finishes.Furniture, two level of marking appearances.
|
|
2013-05-23 12:26:38
Check time: decorative engineering completed. Curtain wall projects completed. Furniture grade II identifies the scene.
|
|
2013-05-23 12:28:18
check time: decoration complete. Curtain wall construction is completed. Furniture, farm level 2 identity. ;
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)