|
關注:1
2013-05-23 12:21
求翻譯:2006年5月—2007年6月參與文昌195和樂東8-3A導管架預制花片、井口片、立管卡子等組對及安裝工作是什么意思?![]() ![]() 2006年5月—2007年6月參與文昌195和樂東8-3A導管架預制花片、井口片、立管卡子等組對及安裝工作
問題補充: |
|
2013-05-23 12:21:38
May 2006 - 2007 in June and music Wenchang 195 East 8-3A jacket pre-Motif, wellhead piece, riser clamps and installation of such group
|
|
2013-05-23 12:23:18
May 2006 - June 2007 195 participating Wenchang and Le Dong A duct structure 8 - 3 prefabricated piece riser cards, wellhead chips, and installation work, such as the Group
|
|
2013-05-23 12:24:58
In May, 2006 - June, 2007 participates in wenchang 195 leading pipe support groups and so on prefabrication flower petal, well head piece, pipe riser clip with Ledong 8-3A to and the erection work
|
|
2013-05-23 12:26:38
May 2006: participation in Wenchang 195 and parakmeria lotungensis 8-3A jacket prefabricated flower piece, well, groups such as riser clamp and installation work
|
|
2013-05-23 12:28:18
May 2006 - 2007 in June and music Wenchang 195 East 8-3A jacket pre-Motif, wellhead piece, riser clamps and installation of such group
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區