|
關(guān)注:1
2013-05-23 12:21
求翻譯:2010年4月至今參與SNATLONALOILWELL C033浮吊項(xiàng)目扒桿,轉(zhuǎn)塔,滑輪組;裝配及軌道安裝工作是什么意思?![]() ![]() 2010年4月至今參與SNATLONALOILWELL C033浮吊項(xiàng)目扒桿,轉(zhuǎn)塔,滑輪組;裝配及軌道安裝工作
問(wèn)題補(bǔ)充: |
|
2013-05-23 12:21:38
April 2010 the project has involved SNATLONALOILWELL C033 floating crane derrick, turret, pulley blocks; assembly and installation of the track
|
|
2013-05-23 12:23:18
April 2010 has so far involved in SNATLONALOILWELL C par 033 floating crane project seeks to tap, pivots, assembling and installation work.
|
|
2013-05-23 12:24:58
In April, 2010 until now participates in SNATLONALOILWELL the C033 derrick barge project digging up the pole, the turret, the block and tackle; Assembly and track erection work
|
|
2013-05-23 12:26:38
April 2010-present participation in SNATLONALOILWELL C033 floating crane project Derrick, turret and pulleys; assemble and track installation work
|
|
2013-05-23 12:28:18
April 2010 the project has involved SNATLONALOILWELL C033 floating crane derrick, turret, pulley blocks; assembly and installation of the track
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無(wú)主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)