求翻譯:3為了防止抹灰層的污染和打鑿損壞,抹灰應待上下水、電纜、各種管道等安裝完畢后進行,在施工中并應采取相關防護措施對已完的安裝設備、管道等保護。是什么意思?![]() ![]() 3為了防止抹灰層的污染和打鑿損壞,抹灰應待上下水、電纜、各種管道等安裝完畢后進行,在施工中并應采取相關防護措施對已完的安裝設備、管道等保護。
問題補充: |
|
2013-05-23 12:21:38
3 layers of plaster in order to prevent pollution and drilled damaged plaster should be up and down the water, cables, pipes, etc. After installation, all carried out in the construction and protective measures should be taken to have completed the installation of equipment, piping and other protect
|
|
2013-05-23 12:23:18
plastered layer 3 in order to prevent the pollution damage, plastering and sunk the water should be treated, and cables, pipelines, and so on, after installation in the construction and related protective measures should be taken to finish the installation of equipment, piping, and other protection.
|
|
2013-05-23 12:24:58
3 in order to prevent the plastering level the pollution and hits chisels the damage, after the plastering should treat launches, installments and so on electric cable, each kind of pipeline finished carries on, and should take the correlation protective measure in the construction to install protec
|
|
2013-05-23 12:26:38
3 in order to prevent the pollution of plaster layer and pick damaged, plaster should be shangxiashui, cables, pipes, and so after the installation is complete, in construction and related protective measures should be taken to have finished the installation equipment, pipes and other protection.
|
|
2013-05-23 12:28:18
3 layers of plaster in order to prevent pollution and drilled damaged plaster should be up and down the water, cables, pipes, etc. After installation, all carried out in the construction and protective measures should be taken to have completed the installation of equipment, piping and other protect
|